5m heat exchanger for the petrochemical industry in Egypt Equipment being loaded into a top floor of a factory with a bespoke manufactured lifting platform; the entire redundant process and packing line was removed this way and the new installed the same, due to equipment being too large to fit through the factory Equipment being loaded into a top floor of a factory with a bespoke manufactured lifting platform; the entire redundant process and packing line was removed this way and the new installed the same, due to equipment being too large to fit through the factory An installation of a platform along with a flighted conveyor designed and manufactured in house to feed a multi head and bagging system